Wage Determination PA20260077-14564-bld
Blair, PA · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination PA20260077-14564-bld covers 31 trade classifications for building construction in Blair, PA. Total packages (base + fringe) range from $27.91/hr to $89.11/hr, with the highest going to SHEET METAL WORKER: HVAC DUCT INSTALLATION ONLY FOOTNOTE: PAID HOLIDAY: ELECTION DAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: PA20260077-14564-bld
Revision: 2
Type: building
County: Blair
State: PA
Effective: May 17, 2026
Trades covered: 31
Highest rate: $89.11/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL | $40.00 | $29.81 | $69.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $33.01 | $18.09 | $51.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $31.97 | $21.35 | $53.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $50.86 | $31.78 | $82.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $25.40 | $25.47 | $50.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL, REINFORCING, RIGGER, AND STRUCTURAL | $32.29 | $32.41 | $64.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | $36.87 | $21.32 | $58.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $30.24 | $12.05 | $42.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $18.15 | $9.76 | $27.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER-BRICK | $29.56 | $17.05 | $46.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $34.14 | $22.00 | $56.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | $13.13 | $36.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $32.39 | $23.26 | $55.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, AND SPRAY ONLY | $30.56 | $23.72 | $54.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.36 | $29.45 | $70.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $29.20 | $12.86 | $42.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $47.75 | $26.55 | $74.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $40.02 | $26.55 | $66.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER | $36.87 | $21.32 | $58.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP | $29.70 | $21.32 | $51.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 | $51.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | $21.32 | $53.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER, EXCLUDES WATERPROOFING | $33.50 | $20.66 | $54.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 32.03 22.87 ROOFER: WATERPROOFING ONLY | $29.50 | $21.10 | $50.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: HVAC DUCT INSTALLATION ONLY FOOTNOTE: PAID HOLIDAY: ELECTION DAY | $45.02 | $44.09 | $89.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $49.75 | $28.96 | $78.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $35.64 | $21.63 | $57.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 | $0.00 | $0.00 | $0.00 | $0.00 |