Wage Determination PA20260076-14534-bld

Berks, PA · building · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination PA20260076-14534-bld covers 36 trade classifications for building construction in Berks, PA. Total packages (base + fringe) range from $22.64/hr to $102.43/hr, with the highest going to PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: PA20260076-14534-bld
Revision: 2
Type: building
County: Berks
State: PA
Effective: May 17, 2026
Trades covered: 36
Highest rate: $102.43/hr
Official source: SAM.gov reference PA20260076View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL $40.00 $29.81 $69.81 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $55.00 $35.48 $90.48 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $37.83 $16.98 $54.81 $0.00 $0.00 $0.00 $0.00
CARPENTER $36.84 $20.19 $57.03 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.95 $16.78 $41.73 $0.00 $0.00 $0.00 $0.00
DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING $61.41 $38.44 $99.85 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.02 $27.98 $74.00 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.84 $28.36 $69.20 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50 $40.33 $32.62 $72.95 $0.00 $0.00 $0.00 $0.00
GLAZIER $41.14 $3.94 $45.08 $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $34.27 $22.55 $56.82 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $56.50 $45.30 $101.80 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $37.26 $32.63 $69.89 $0.00 $0.00 $0.00 $0.00
LABORER $36.37 $25.32 $61.69 $0.00 $0.00 $0.00 $0.00
LABORER $26.00 $23.97 $49.97 $0.00 $0.00 $0.00 $0.00
LABORER (CONCRETE SAW; CONCRETE WORKER; FIRE WATCH) $21.57 $15.04 $36.61 $0.00 $0.00 $0.00 $0.00
LABORER (FORKLIFT) $27.27 $15.04 $42.31 $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT $21.43 $11.13 $32.56 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $19.43 $8.63 $28.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $34.34 $15.47 $49.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $28.55 $15.78 $44.33 $0.00 $0.00 $0.00 $0.00
PAINTER $27.07 $15.79 $42.86 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY ONLY $29.51 $20.15 $49.66 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $59.65 $42.78 $102.43 $0.00 $0.00 $0.00 $0.00
PLUMBER $40.90 $18.13 $59.03 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $32.59 $18.10 $50.69 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $34.18 $26.26 $60.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $32.86 $25.86 $58.72 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (HOIST, FORKLIFT) $38.05 $27.39 $65.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (HOIST, FORKLIFT) $35.32 $26.59 $61.91 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE, GRADALL, BULLDOZER, BOBCAT/SKID STEER/ SKID LOADER, GRADER/BLADE, LOADER, PAVER $40.57 $28.15 $68.72 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY $43.09 $42.52 $85.61 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $49.75 $28.96 $78.71 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $26.05 $21.00 $47.05 $0.00 $0.00 $0.00 $0.00
TILE SETTER $51.36 $30.02 $81.38 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $22.64 $0.00 $22.64 $0.00 $0.00 $0.00 $0.00
View all WDs for Berks → Revision history →