Wage Determination PA20260070-14587-bld
Venango, PA · building · Rev. 3 · Effective May 17, 2026
Quick Answer
Wage determination PA20260070-14587-bld covers 41 trade classifications for building construction in Venango, PA. Total packages (base + fringe) range from $24.86/hr to $85.90/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: PA20260070-14587-bld
Revision: 3
Type: building
County: Venango
State: PA
Effective: May 17, 2026
Trades covered: 41
Highest rate: $85.90/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 | $75.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: INCLUDING POINTING, CAULKING, CLEANING AND BRICK REFRACTORY WORK ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $34.14 | $22.77 | $56.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $35.94 | $19.02 | $54.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $31.95 | $17.09 | $49.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION, FLOOR LAYER - CARPET, HARDWOOD, AND VINYL, FORM WORK | $25.57 | $10.53 | $36.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 | $53.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $49.11 | $36.79 | $85.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $51.45 | $29.77 | $81.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $29.05 | $16.89 | $45.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $28.30 | $10.73 | $39.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $36.26 | $28.16 | $64.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, RIGGER | $35.22 | $30.56 | $65.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $34.91 | $30.85 | $65.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | $36.87 | $21.32 | $58.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $26.82 | $19.39 | $46.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $23.23 | $18.53 | $41.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $18.41 | $6.45 | $24.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $34.14 | $22.77 | $56.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| MECHANICAL INSULATOR, INCLUDING DUCT AND PIPE AND EXCLUDING WORK ON INDUSTRIAL SITES | $30.60 | $17.16 | $47.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: HIGHLIFT | $31.19 | $22.01 | $53.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $36.53 | $22.01 | $58.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $36.01 | $23.72 | $59.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $27.95 | $16.12 | $44.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER ONLY | $30.56 | $23.72 | $54.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | $32.39 | $23.26 | $55.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $47.75 | $26.55 | $74.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $40.02 | $26.55 | $66.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $48.15 | $29.17 | $77.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $30.69 | $18.99 | $49.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $46.98 | $25.47 | $72.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 | $51.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: PAVER, BULLDOZER, DRILL RIG CAISSONS, FORKLIFT, MAN LIFT/OUTSIDE ELEVATOR | $36.87 | $21.32 | $58.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER, FORKLIFT | $32.25 | $21.32 | $53.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER, EXCLUDES INSTALLATION OF METAL ROOFS | $24.13 | $11.95 | $36.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $31.43 | $20.05 | $51.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $49.75 | $30.26 | $80.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $35.64 | $21.63 | $57.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $24.98 | $11.88 | $36.86 | $0.00 | $0.00 | $0.00 | $0.00 |