Wage Determination PA20260057-14537-bld
Juniata, PA · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination PA20260057-14537-bld covers 39 trade classifications for building construction in Juniata, PA. Total packages (base + fringe) range from $25.25/hr to $99.85/hr, with the highest going to DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: PA20260057-14537-bld
Revision: 2
Type: building
County: Juniata
State: PA
Effective: May 17, 2026
Trades covered: 39
Highest rate: $99.85/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $39.18 | $26.07 | $65.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $32.66 | $21.58 | $54.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $36.84 | $20.19 | $57.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $25.71 | $12.02 | $37.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $19.81 | $9.03 | $28.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING | $61.41 | $38.44 | $99.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $39.27 | $22.28 | $61.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $25.44 | $12.35 | $37.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, EXCLUDES ALARM INSTALLATION, SOUND AND COMMUNICATION INSTALLATION, HVAC/TEMPERATURE CONTROL INSTALLATION, AND LOW VOLTAGE WIRING | $28.60 | $15.84 | $44.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $37.26 | $32.63 | $69.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $34.65 | $31.12 | $65.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $21.57 | $15.04 | $36.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (FORKLIFT) | $25.29 | $15.04 | $40.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $18.14 | $7.11 | $25.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $22.29 | $15.92 | $38.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $32.66 | $21.58 | $54.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.88 | $14.13 | $44.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | $13.93 | $40.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $36.53 | $22.01 | $58.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $37.10 | $27.62 | $64.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $27.95 | $16.12 | $44.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.36 | $29.45 | $70.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $51.69 | $27.07 | $78.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $41.36 | $29.45 | $70.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $24.31 | $3.95 | $28.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR (FORKLIFT) | $41.88 | $30.03 | $71.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | $31.58 | $78.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: PAVER | $32.59 | $18.10 | $50.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $41.37 | $13.28 | $54.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $36.13 | $30.32 | $66.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY | $43.09 | $42.52 | $85.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $33.23 | $19.03 | $52.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/GRINDER | $33.94 | $19.03 | $52.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $33.83 | $20.78 | $54.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $35.64 | $21.63 | $57.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $24.98 | $11.88 | $36.86 | $0.00 | $0.00 | $0.00 | $0.00 |