Wage Determination PA20260048-14571-bld
Clinton, PA · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination PA20260048-14571-bld covers 34 trade classifications for building construction in Clinton, PA. Total packages (base + fringe) range from $27.79/hr to $82.64/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: PA20260048-14571-bld
Revision: 2
Type: building
County: Clinton
State: PA
Effective: May 17, 2026
Trades covered: 34
Highest rate: $82.64/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL | $33.62 | $18.79 | $52.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, INCLUDING POINTING, CAULKING CLEANING AND BRICK REFRACTORY WORK | $37.17 | $22.94 | $60.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $34.76 | $20.64 | $55.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $31.97 | $21.35 | $53.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $50.86 | $31.78 | $82.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $25.40 | $25.47 | $50.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL, REINFORCING, RIGGER, AND STRUCTURAL | $32.29 | $32.41 | $64.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $25.98 | $19.53 | $45.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $18.30 | $9.49 | $27.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $23.23 | $18.53 | $41.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $34.00 | $22.63 | $56.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | $12.97 | $36.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $36.53 | $22.01 | $58.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $27.95 | $16.12 | $44.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER ONLY | $30.56 | $23.72 | $54.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | $32.39 | $23.26 | $55.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $47.75 | $26.55 | $74.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $40.02 | $26.55 | $66.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.36 | $29.45 | $70.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $20.97 | $10.78 | $31.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $32.27 | $18.16 | $50.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS | $36.87 | $21.32 | $58.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 | $51.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: PAVER | $36.87 | $21.32 | $58.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | $21.32 | $53.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $27.00 | $12.19 | $39.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $39.50 | $30.79 | $70.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $36.13 | $30.32 | $66.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $49.75 | $28.96 | $78.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $35.64 | $21.63 | $57.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $24.98 | $12.17 | $37.15 | $0.00 | $0.00 | $0.00 | $0.00 |