Wage Determination PA20260037-14597-res

Monroe, PA · residential · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination PA20260037-14597-res covers 32 trade classifications for residential construction in Monroe, PA. Total packages (base + fringe) range from $40.48/hr to $103.63/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: PA20260037-14597-res
Revision: 2
Type: residential
County: Monroe
State: PA
Effective: May 17, 2026
Trades covered: 32
Highest rate: $103.63/hr
Official source: SAM.gov reference PA20260037View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKERS/INSULATOR $39.18 $26.07 $65.25 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $55.00 $35.48 $90.48 $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON $37.07 $18.82 $55.89 $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON $32.39 $16.06 $48.45 $0.00 $0.00 $0.00 $0.00
CARPENTER & SOFT FLOOR LAYER $28.02 $12.59 $40.61 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $37.13 $14.30 $51.43 $0.00 $0.00 $0.00 $0.00
DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING $61.41 $38.44 $99.85 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $23.82 $16.66 $40.48 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $63.38 $40.25 $103.63 $0.00 $0.00 $0.00 $0.00
FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A $34.40 $26.32 $60.72 $0.00 $0.00 $0.00 $0.00
FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A $35.27 $26.59 $61.86 $0.00 $0.00 $0.00 $0.00
FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A $35.72 $26.72 $62.44 $0.00 $0.00 $0.00 $0.00
FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A $41.84 $28.52 $70.36 $0.00 $0.00 $0.00 $0.00
FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A $39.59 $27.85 $67.44 $0.00 $0.00 $0.00 $0.00
FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A $42.12 $28.60 $70.72 $0.00 $0.00 $0.00 $0.00
FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY A $39.87 $27.94 $67.81 $0.00 $0.00 $0.00 $0.00
IRONWORKERS $37.26 $32.63 $69.89 $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 CLEANING, SCRUBBING, WASHING AND POLISHING OF FLOORS, FURNITURE AND WINDOWS, STRIPPING, DISMANTLING, OILING AND MOVING OF CONCRETE FO $24.54 $17.14 $41.68 $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 ASBESTOS REMOVAL, HAZARDOUS AND TOXIC WASTE REMOVAL, ALL WORK IN CONNECTION WITH HANDING, CONTROL, REMOVAL, ABATEMENT, ENCAPSULATION $25.57 $17.14 $42.71 $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3 MASON TENDERS, MIXING OF MORTAR, PLASTER AND MORTAR PUMPS, PLASTER TENDERS, CAISSON WORK, BLAST FURNACES, COKE OVENS AND ALL RELATED $25.34 $17.14 $42.48 $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 4 SKID-STEERING LOADER AND FOLKLIFT LABORERS. OPERATION OF ROUGH TERRAIN FORKLIFTS, SKID-STEERING LOADERS $25.34 $17.14 $42.48 $0.00 $0.00 $0.00 $0.00
PAINTERS $29.02 $21.14 $50.16 $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY $30.02 $21.14 $51.16 $0.00 $0.00 $0.00 $0.00
PLASTERER $37.81 $13.70 $51.51 $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER $51.69 $27.07 $78.76 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CONVEYORS, BUILDING HOIST, HIGH OR LOW PRESSURE BOILERS, WELL DRILLERS, ASPHALT PLANT ENGINEERS, DITCH WITCH TYPE TR $36.87 $27.04 $63.91 $0.00 $0.00 $0.00 $0.00
ROOFERS $37.35 $21.85 $59.20 $0.00 $0.00 $0.00 $0.00
ROOFERS $34.35 $21.85 $56.20 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $36.13 $30.32 $66.45 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 EUCLID-TYPE, OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS, STRADDLE TRUCKS, PUSHER, ARTICULATE DUMPED TRUCKS, LOW BOY $42.43 $0.00 $42.43 $0.00 $0.00 $0.00 $0.00
WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE $41.94 $0.00 $41.94 $0.00 $0.00 $0.00 $0.00
WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE $41.87 $0.00 $41.87 $0.00 $0.00 $0.00 $0.00
View all WDs for Monroe → Revision history →