ASBESTOS WORKERS/INSULATOR
|
$60.84 |
$48.38 |
$109.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BOILERMAKER
|
$55.00 |
$35.48 |
$90.48 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER
|
$48.70 |
$31.61 |
$80.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER/LATHER
|
$55.82 |
$30.09 |
$85.91 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$48.70 |
$32.26 |
$80.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS PER HO
|
$49.88 |
$33.13 |
$83.01 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS PER HO
|
$50.18 |
$33.22 |
$83.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
DRYWALL FINISHER/TAPER
|
$42.25 |
$32.16 |
$74.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$70.97 |
$46.13 |
$117.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN)
|
$63.97 |
$30.40 |
$94.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY
|
$37.57 |
$23.32 |
$60.89 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
FLOOR LAYER: CARPET
|
$56.51 |
$32.39 |
$88.90 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER
|
$46.09 |
$34.83 |
$80.92 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER, REINFORCING THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW Y
|
$50.39 |
$36.05 |
$86.44 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: RIGGER AND MACHINERY MOVER THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE B
|
$46.86 |
$36.05 |
$82.91 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: STRUCTURAL AND ORNAMENTAL
|
$56.50 |
$45.30 |
$101.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER
|
$41.00 |
$27.04 |
$68.04 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 1 BUILDING SITE WORK; STRIPPING AND DISMANTLING CONCRETE FORM WORK; LOADING, UNLOADING, CARRYING AND HANDLING OF ALL REINFORCED STEEL AN
|
$39.10 |
$26.69 |
$65.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 10 WELDERS AND BURNERS
|
$40.93 |
$26.69 |
$67.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 11 MASON TENDER
|
$39.50 |
$26.69 |
$66.19 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 2 POWER BUGGIES; BURNERS ON DEMOLITION
|
$39.20 |
$26.69 |
$65.89 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 3 WAGON DRILL OPERATOR
|
$39.25 |
$26.69 |
$65.94 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 4 POWDERMEN; WAGON DRILL OPERATOR; CIRCULAR CAISSON EXCAVATION; UNDERPINNING EXCAVATION
|
$39.40 |
$26.69 |
$66.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 5 CAISSON BOTTOM MAN
|
$39.45 |
$26.69 |
$66.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 7 TRACKMEN; BRAKEMEN; GROUTMEN; BOTTOM SHAFT MEN; ALL OTHER MEN IN FREE AIR TUNNELS.$ 40.38 26.69 LABORER GROUP 6 YARD WORKERS
|
$39.24 |
$26.69 |
$65.93 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 8 FORM SETTERS
|
$40.53 |
$26.69 |
$67.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 9 MINERS BORE DRIVER; BLASTERS; DRILLERS; PNEUMATIC SHIELD OPERATORS
|
$40.68 |
$26.69 |
$67.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LANDSCAPE LABORER FARM TRACTOR DRIVER, HYDROSEEDER NOZZLEMAN AND MULCHER NOZZLEMAN: FOOTNOTE: A. PAID HOLIDAYS: INDEPENDENCE DAY, LABOR DAY, AND THANK
|
$31.73 |
$23.72 |
$55.45 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MARBLE FINISHER
|
$25.10 |
$20.75 |
$45.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MARBLE SETTER
|
$44.90 |
$30.75 |
$75.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MASON - STONE
|
$48.40 |
$31.95 |
$80.35 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MILLWRIGHT
|
$54.54 |
$38.78 |
$93.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MORE OF SERVICE OR 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. EIGHT PAID HOLIDAYS: NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'
|
$71.85 |
$38.44 |
$110.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OF VACATION, ACCRUED IN THE SAME WAY
|
$37.92 |
$23.32 |
$61.24 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OF VACATION, ACCRUED IN THE SAME WAY
|
$37.57 |
$23.32 |
$60.89 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OF VACATION, ACCRUED IN THE SAME WAY
|
$37.67 |
$23.32 |
$60.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS
|
$42.49 |
$28.10 |
$70.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS
|
$41.24 |
$28.10 |
$69.34 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN
|
$48.25 |
$44.92 |
$93.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLASTERER
|
$45.08 |
$33.59 |
$78.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER
|
$70.53 |
$38.81 |
$109.34 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POINTER, CAULKER AND CLEANER
|
$50.00 |
$30.70 |
$80.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, HELIC
|
$54.52 |
$34.49 |
$89.01 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 1A MACHINES HANDLING STEEL, OR THE FUNCTIONAL EQUIVALENT, AND STONE IN CONNECTION WITH ERECTION 15 TON AND OVER FACTO
|
$57.52 |
$35.38 |
$92.90 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, PAVERS
|
$54.27 |
$34.42 |
$88.69 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD F
|
$57.29 |
$35.29 |
$92.58 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MAINTENANCE ENGINEER,ELEVATOR OPERA
|
$48.16 |
$32.62 |
$80.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 6 FIREMAN, OILERS AND DECK HANDS, GREASE TRUCK. MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONT
|
$47.17 |
$32.33 |
$79.50 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFERS: COMPOSITION FOOTNOTE: A. PAID HOLIDAY: ELECTION DAY
|
$41.48 |
$33.37 |
$74.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFERS: SHINGLES FOOTNOTE: A. PAID HOLIDAY: ELECTION DAY
|
$31.25 |
$21.75 |
$53.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFERS: SLATE AND TILE
|
$34.25 |
$21.75 |
$56.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$62.62 |
$50.66 |
$113.28 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$33.89 |
$24.25 |
$58.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SPRINKLER FITTER
|
$66.22 |
$34.25 |
$100.47 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
STEAMFITTER
|
$72.52 |
$44.58 |
$117.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO FINISHER
|
$27.03 |
$20.58 |
$47.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO WORKER/SETTER
|
$48.01 |
$28.67 |
$76.68 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE FINISHER
|
$25.10 |
$20.75 |
$45.85 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE SETTER
|
$51.36 |
$30.02 |
$81.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, SITE PREPARATION, PAVING AND UTILITIES ON BUILDING CONSTRUCTION: GROUP 2 - DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR
|
$37.67 |
$23.32 |
$60.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
WINDOW TINTER
|
$25.02 |
$13.06 |
$38.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |