Wage Determination OR20260084-14434-bld
Curry, OR · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination OR20260084-14434-bld covers 14 trade classifications for building construction in Curry, OR. Total packages (base + fringe) range from $56.41/hr to $95.49/hr, with the highest going to PLUMBER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: OR20260084-14434-bld
Revision: 1
Type: building
County: Curry
State: OR
Effective: May 17, 2026
Trades covered: 14
Highest rate: $95.49/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $49.60 | $25.15 | $74.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $52.62 | $16.81 | $69.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 | $66.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $50.03 | $24.00 | $74.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| HEAT & FROST INSULATOR | $62.02 | $22.36 | $84.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $36.71 | $28.16 | $64.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $39.11 | $17.30 | $56.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: HOD CARRIER | $43.79 | $17.05 | $60.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $43.79 | $17.05 | $60.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $40.41 | $17.30 | $57.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $54.75 | $16.90 | $71.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $53.60 | $16.90 | $70.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $60.77 | $34.72 | $95.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $54.99 | $33.92 | $88.91 | $0.00 | $0.00 | $0.00 | $0.00 |