Wage Determination OR20260082-14432-bld
Coos, OR · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination OR20260082-14432-bld covers 14 trade classifications for building construction in Coos, OR. Total packages (base + fringe) range from $39.55/hr to $95.49/hr, with the highest going to PLUMBER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: OR20260082-14432-bld
Revision: 1
Type: building
County: Coos
State: OR
Effective: May 17, 2026
Trades covered: 14
Highest rate: $95.49/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $49.60 | $25.15 | $74.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $30.07 | $12.04 | $42.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 | $66.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $50.03 | $24.00 | $74.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| HEAT & FROST INSULATOR | $62.02 | $22.36 | $84.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $36.71 | $28.16 | $64.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $27.72 | $11.83 | $39.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: HOD CARRIER | $43.79 | $17.05 | $60.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $43.79 | $17.05 | $60.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $40.41 | $17.30 | $57.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $54.75 | $16.90 | $71.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $53.60 | $16.90 | $70.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $60.77 | $34.72 | $95.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $45.40 | $31.49 | $76.89 | $0.00 | $0.00 | $0.00 | $0.00 |