Wage Determination OR20260064-14432-hvy
Coos, OR · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination OR20260064-14432-hvy covers 34 trade classifications for heavy construction in Coos, OR. Total packages (base + fringe) range from $22.05/hr to $88.71/hr, with the highest going to LINE CONSTRUCTION: LINEMAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: OR20260064-14432-hvy
Revision: 1
Type: heavy
County: Coos
State: OR
Effective: May 17, 2026
Trades covered: 34
Highest rate: $88.71/hr