Wage Determination OR20260057-14442-hvy

Lane, OR · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination OR20260057-14442-hvy covers 29 trade classifications for heavy construction in Lane, OR. Total packages (base + fringe) range from $12.40/hr to $82.83/hr, with the highest going to IRONWORKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: OR20260057-14442-hvy
Revision: 1
Type: heavy
County: Lane
State: OR
Effective: May 17, 2026
Trades covered: 29
Highest rate: $82.83/hr
Official source: SAM.gov reference OR20260057View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY $53.60 $16.90 $70.50 $0.00 $0.00 $0.00 $0.00
AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY $56.66 $16.90 $73.56 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $49.60 $25.15 $74.75 $0.00 $0.00 $0.00 $0.00
CARPENTERS $53.94 $16.81 $70.75 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $22.47 $9.29 $31.76 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $24.05 $0.00 $24.05 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (LANE COUNTY) $50.03 $24.00 $74.03 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (LANE) $56.46 $23.05 $79.51 $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $24.74 $5.43 $30.17 $0.00 $0.00 $0.00 $0.00
IRONWORKER $48.31 $34.52 $82.83 $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT SPREADER $22.18 $9.39 $31.57 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $19.52 $6.22 $25.74 $0.00 $0.00 $0.00 $0.00
LABORER: FORM-STRIPPING $19.27 $6.32 $25.59 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $10.60 $1.80 $12.40 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $18.39 $6.74 $25.13 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $22.39 $6.90 $29.29 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 BLASTER, DEMOLITION; LABORER: WATER, SEWER UNDERGROUND; CHAIN SAW $39.11 $17.30 $56.41 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 ASPHALT RAKER; PIPELAYER; GRADE CHECKER; VIBRATING PLATE $40.41 $17.30 $57.71 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 FLAGGER, TRAFFIC CONTROL-CONE SETTER $34.39 $17.30 $51.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $25.06 $5.94 $31.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $20.00 $0.73 $20.73 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $19.77 $0.00 $19.77 $0.00 $0.00 $0.00 $0.00
PAINTERS $39.94 $16.68 $56.62 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $26.19 $11.58 $37.77 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $32.10 $5.90 $38.00 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.11 $8.81 $24.92 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $17.07 $5.50 $22.57 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $18.65 $6.70 $25.35 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 FLATBED TRUCK; OFF THE ROAD TRUCK $35.41 $18.30 $53.71 $0.00 $0.00 $0.00 $0.00
View all WDs for Lane → Revision history →