Wage Determination OR20260057-14442-hvy
Lane, OR · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination OR20260057-14442-hvy covers 29 trade classifications for heavy construction in Lane, OR. Total packages (base + fringe) range from $12.40/hr to $82.83/hr, with the highest going to IRONWORKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: OR20260057-14442-hvy
Revision: 1
Type: heavy
County: Lane
State: OR
Effective: May 17, 2026
Trades covered: 29
Highest rate: $82.83/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY | $53.60 | $16.90 | $70.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY | $56.66 | $16.90 | $73.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $49.60 | $25.15 | $74.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS | $53.94 | $16.81 | $70.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $22.47 | $9.29 | $31.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $24.05 | $0.00 | $24.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (LANE COUNTY) | $50.03 | $24.00 | $74.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (LANE) | $56.46 | $23.05 | $79.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $24.74 | $5.43 | $30.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $48.31 | $34.52 | $82.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT SPREADER | $22.18 | $9.39 | $31.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $19.52 | $6.22 | $25.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FORM-STRIPPING | $19.27 | $6.32 | $25.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $10.60 | $1.80 | $12.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $18.39 | $6.74 | $25.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.39 | $6.90 | $29.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 BLASTER, DEMOLITION; LABORER: WATER, SEWER UNDERGROUND; CHAIN SAW | $39.11 | $17.30 | $56.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 ASPHALT RAKER; PIPELAYER; GRADE CHECKER; VIBRATING PLATE | $40.41 | $17.30 | $57.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 FLAGGER, TRAFFIC CONTROL-CONE SETTER | $34.39 | $17.30 | $51.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: EXCAVATOR | $25.06 | $5.94 | $31.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $20.00 | $0.73 | $20.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $19.77 | $0.00 | $19.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $39.94 | $16.68 | $56.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $26.19 | $11.58 | $37.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $32.10 | $5.90 | $38.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $16.11 | $8.81 | $24.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $17.07 | $5.50 | $22.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $18.65 | $6.70 | $25.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1 FLATBED TRUCK; OFF THE ROAD TRUCK | $35.41 | $18.30 | $53.71 | $0.00 | $0.00 | $0.00 | $0.00 |