Wage Determination OH20260057-14487-bld
Shelby, OH · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination OH20260057-14487-bld covers 38 trade classifications for building construction in Shelby, OH. Total packages (base + fringe) range from $10.39/hr to $83.56/hr, with the highest going to PIPEFITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: OH20260057-14487-bld
Revision: 1
Type: building
County: Shelby
State: OH
Effective: May 17, 2026
Trades covered: 38
Highest rate: $83.56/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $37.00 | $28.27 | $65.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICK POINTER/CAULKER/CLEANER | $33.30 | $18.28 | $51.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $27.47 | $12.26 | $39.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: TILE FINISHER | $26.88 | $11.81 | $38.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: TILE SETTER | $29.90 | $16.52 | $46.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $21.09 | $9.08 | $30.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $23.47 | $10.07 | $33.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $18.57 | $3.12 | $21.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $17.63 | $5.64 | $23.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $48.40 | $25.24 | $73.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $36.50 | $25.06 | $61.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $35.50 | $29.20 | $64.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $36.00 | $23.57 | $59.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $33.18 | $23.73 | $56.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $28.73 | $11.80 | $40.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $32.35 | $16.42 | $48.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $21.67 | $8.30 | $29.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE & IRRIGATION | $10.39 | $0.00 | $10.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $22.74 | $8.60 | $31.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $18.37 | $4.79 | $23.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.59 | $7.76 | $32.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.00 | $3.26 | $23.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $23.50 | $7.51 | $31.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $17.43 | $2.72 | $20.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $25.85 | $10.42 | $36.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $17.91 | $10.85 | $28.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $51.00 | $32.56 | $83.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $51.00 | $32.56 | $83.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $29.57 | $17.20 | $46.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $44.14 | $16.41 | $60.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $42.98 | $16.41 | $59.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $29.07 | $19.84 | $48.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $39.58 | $35.15 | $74.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $23.84 | $9.39 | $33.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $22.09 | $13.00 | $35.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER | $30.25 | $25.16 | $55.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $25.91 | $9.18 | $35.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP | $17.97 | $4.14 | $22.11 | $0.00 | $0.00 | $0.00 | $0.00 |