Wage Determination NV20260042-16025-res
Clark, NV · residential · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination NV20260042-16025-res covers 21 trade classifications for residential construction in Clark, NV. Total packages (base + fringe) range from $15.00/hr to $107.87/hr, with the highest going to ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YE. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: NV20260042-16025-res
Revision: 2
Type: residential
County: Clark
State: NV
Effective: May 17, 2026
Trades covered: 21
Highest rate: $107.87/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND BATT INSULATION | $16.64 | $0.00 | $16.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.00 | $0.00 | $17.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $58.48 | $27.62 | $86.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YE | $69.43 | $38.44 | $107.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: SOFT FLOORS | $28.26 | $12.11 | $40.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $22.61 | $0.00 | $22.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $15.00 | $0.00 | $15.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $15.21 | $0.00 | $15.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $22.09 | $0.00 | $22.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER ( MASON TENDER-CEMENT/CONCRETE) | $30.30 | $15.02 | $45.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER ( PIPELAYER) | $30.55 | $15.02 | $45.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $15.65 | $0.00 | $15.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.16 | $0.00 | $20.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.11 | $0.00 | $24.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $18.76 | $0.00 | $18.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $19.18 | $0.00 | $19.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $18.94 | $0.00 | $18.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR ( LOADER) | $63.79 | $36.40 | $100.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR ( PAVER) | $63.90 | $36.40 | $100.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $18.50 | $0.00 | $18.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $29.22 | $0.00 | $29.22 | $0.00 | $0.00 | $0.00 | $0.00 |