Wage Determination NV20260038-16025-bld
Clark, NV · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination NV20260038-16025-bld covers 52 trade classifications for building construction in Clark, NV. Total packages (base + fringe) range from $23.30/hr to $108.78/hr, with the highest going to POWER EQUIPMENT OPERATOR GROUP 23 CRANE - OVER 350 TONS. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: NV20260038-16025-bld
Revision: 2
Type: building
County: Clark
State: NV
Effective: May 17, 2026
Trades covered: 52
Highest rate: $108.78/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $62.00 | $23.48 | $85.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $53.57 | $20.05 | $73.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $57.69 | $21.53 | $79.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $52.29 | $19.79 | $72.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $58.48 | $27.62 | $86.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YE | $69.43 | $38.44 | $107.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $58.44 | $28.91 | $87.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $50.70 | $35.15 | $85.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $50.70 | $35.15 | $85.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $50.70 | $35.15 | $85.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER ( MASON TENDER - BRICK, MASON TENDER - CEMENT/CONCRETE) | $38.84 | $33.41 | $72.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER ( PIPELAYER) | $34.45 | $16.30 | $50.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $23.30 | $0.00 | $23.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $48.93 | $31.43 | $80.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $50.62 | $24.20 | $74.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $60.00 | $26.80 | $86.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $51.85 | $18.73 | $70.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $60.00 | $26.80 | $86.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 01 FORKLIFT - LESS THAN 5 TONS | $60.84 | $36.40 | $97.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 02 FORKLIFT - 5 TONS OR MORE | $61.79 | $36.40 | $98.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 03 BOBCAT | $62.08 | $36.40 | $98.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 04 | $63.57 | $36.40 | $99.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 04 | $63.90 | $36.40 | $100.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 05 | $64.67 | $36.40 | $101.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 05 | $64.02 | $36.40 | $100.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 06 | $63.79 | $36.40 | $100.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 06 | $64.19 | $36.40 | $100.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 07 HOIST - STIFF LEGS, GUY DERRICK, OR SIMILAR, 25 TONS TO 50 TONS; K-CRANE; POLAR CRANE; SELF-ERECTING TOWER CRANE - 1 | $64.36 | $36.40 | $100.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 08 | $63.90 | $36.40 | $100.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 08 | $64.52 | $36.40 | $100.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 09 OILER - OVER 200 TONS | $65.20 | $36.40 | $101.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 10 | $64.02 | $36.40 | $100.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 10 | $65.36 | $36.40 | $101.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 12 | $64.19 | $36.40 | $100.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 15 HOIST - STIFF LEGS, GUY DERRICK, OR SIMILAR, 200 TONS TO 300 TONS.$ 67.36 36.40 POWER EQUIPMENT OPERATOR GROUP 13 HO | $65.99 | $36.40 | $102.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 16 | $64.52 | $36.40 | $100.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 16 | $67.41 | $36.40 | $103.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 17 CRANE - 80 TONS TO 150 TONS | $67.91 | $36.40 | $104.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 18 TOWER CRANE; HOIST - STIFF LEGS, GUY DERRICK, OR SIMILAR, GREATER THAN 300 TONS | $68.36 | $36.40 | $104.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 19 CRANE - 150 TONS TO 200 TONS | $69.94 | $36.40 | $106.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 20 CRANE - 200 TONS TO 250 TONS | $70.55 | $36.40 | $106.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 21 CRANE - 250 TONS TO 300 TONS | $71.16 | $36.40 | $107.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 22 CRANE - 300 TONS TO 350 TONS | $71.92 | $36.40 | $108.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 23 CRANE - OVER 350 TONS | $72.38 | $36.40 | $108.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 25 CONCRETE PUMP - TRUCK MOUNTED | $65.69 | $36.40 | $102.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $40.76 | $12.42 | $53.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $59.85 | $32.76 | $92.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER | $45.47 | $18.79 | $64.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $48.97 | $31.40 | $80.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $37.35 | $14.22 | $51.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $49.39 | $18.10 | $67.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $37.21 | $33.41 | $70.62 | $0.00 | $0.00 | $0.00 | $0.00 |