Wage Determination NJ20260062-16454-hvy

Salem, NJ · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination NJ20260062-16454-hvy covers 22 trade classifications for heavy construction in Salem, NJ. Total packages (base + fringe) range from $47.96/hr to $107.06/hr, with the highest going to PIPEFITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: NJ20260062-16454-hvy
Revision: 1
Type: heavy
County: Salem
State: NJ
Effective: May 17, 2026
Trades covered: 22
Highest rate: $107.06/hr
Official source: SAM.gov reference NJ20260062View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $47.34 $30.99 $78.33 $0.00 $0.00 $0.00 $0.00
CARPENTER: IN THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER $57.42 $34.17 $91.59 $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING FORM WORK THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER $57.42 $34.17 $91.59 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $49.57 $37.06 $86.63 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN AND CABLE SPLICER $55.05 $48.76 $103.81 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: CABLE SPLICER ON LEAD CABLE $46.51 $34.39 $80.90 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $53.24 $40.40 $93.64 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $54.24 $40.40 $94.64 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL LABORER; LANDSCAPE LABORER, POWER TOOL OPERATOR HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZAR $50.95 $38.53 $89.48 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER: CEMENT/CONCRETE $29.35 $23.07 $52.42 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LE $51.65 $38.53 $90.18 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other $58.84 $35.06 $93.90 $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH AND ROLLER $29.05 $18.91 $47.96 $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH AND ROLLER $40.19 $22.72 $62.91 $0.00 $0.00 $0.00 $0.00
PAINTERS: WORK ON BRIDGES $58.28 $33.85 $92.13 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; pro $46.73 $41.69 $88.42 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $56.30 $50.76 $107.06 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE; DRILL; ELEVATING GRADER; EXCAVATOR; FRONT E $61.72 $37.50 $99.22 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE; HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER; S $60.13 $37.50 $97.63 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR; CRUSHER; FORKLIFT; FRONT END LOADER; LULL; MECHANIC; PAVER, ASPHALT; ROLLE $58.22 $37.50 $95.72 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 BROOM; COMPRESSOR; FARM TRACTOR; FRONT END LOADER; ROLLER, GRADE; PUMP HAZARDOUS WASTE REMOVAL WORK: WORK ON A STAT $56.59 $37.50 $94.09 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER $52.88 $37.50 $90.38 $0.00 $0.00 $0.00 $0.00