Wage Determination NJ20260043-16045-bld

Sussex, NJ · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination NJ20260043-16045-bld covers 31 trade classifications for building construction in Sussex, NJ. Total packages (base + fringe) range from $38.68/hr to $113.99/hr, with the highest going to WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING: 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES T. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: NJ20260043-16045-bld
Revision: 1
Type: building
County: Sussex
State: NJ
Effective: May 17, 2026
Trades covered: 31
Highest rate: $113.99/hr
Official source: SAM.gov reference NJ20260043View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYP $51.74 $46.20 $97.94 $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION $57.42 $34.17 $91.59 $0.00 $0.00 $0.00 $0.00
CEMENT MASON $49.60 $37.96 $87.56 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $44.87 $30.15 $75.02 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $49.94 $50.32 $100.26 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $52.24 $50.32 $102.56 $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN $35.75 $30.22 $65.97 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE $36.50 $30.22 $66.72 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DA $46.41 $31.82 $78.23 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DA $46.51 $31.82 $78.33 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $52.88 $37.50 $90.38 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $56.59 $37.50 $94.09 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $58.22 $37.50 $95.72 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $60.13 $37.50 $97.63 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $61.72 $37.50 $99.22 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $32.91 $5.77 $38.68 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $45.55 $29.86 $75.41 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $57.97 $40.22 $98.19 $0.00 $0.00 $0.00 $0.00
PLASTERER $54.64 $30.95 $85.59 $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION $62.09 $45.05 $107.14 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION $51.30 $51.55 $102.85 $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $57.42 $34.17 $91.59 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER: FIRE SPRINKLERS $67.97 $39.35 $107.32 $0.00 $0.00 $0.00 $0.00
THE REMOVAL, ABATEMENT, ENCLOSURE AND DECONTAMINATION OF PERSONAL PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING AND MACHINERY RELATING TO ASBESTO $28.37 $21.62 $49.99 $0.00 $0.00 $0.00 $0.00
TILE SETTER $64.90 $37.28 $102.18 $0.00 $0.00 $0.00 $0.00
WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING: 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES T $65.43 $42.86 $108.29 $0.00 $0.00 $0.00 $0.00
WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING: 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES T $69.72 $44.27 $113.99 $0.00 $0.00 $0.00 $0.00
WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY $50.05 $33.90 $83.95 $0.00 $0.00 $0.00 $0.00
WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES $58.84 $35.06 $93.90 $0.00 $0.00 $0.00 $0.00
WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL $49.60 $37.96 $87.56 $0.00 $0.00 $0.00 $0.00
WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEIGHT OF THE PLATFORM $52.68 $31.29 $83.97 $0.00 $0.00 $0.00 $0.00
View all WDs for Sussex → Revision history →