Wage Determination NJ20260039-16042-bld

Ocean, NJ · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination NJ20260039-16042-bld covers 34 trade classifications for building construction in Ocean, NJ. Total packages (base + fringe) range from $49.99/hr to $110.29/hr, with the highest going to ELEVATOR A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of B. Eight Paid. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: NJ20260039-16042-bld
Revision: 1
Type: building
County: Ocean
State: NJ
Effective: May 17, 2026
Trades covered: 34
Highest rate: $110.29/hr
Official source: SAM.gov reference NJ20260039View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and mach $28.37 $21.62 $49.99 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR: PAID HOLIDAYS: THE LAST DAY PRIOR TO THE CHRISTMAS AND NEW YEAR'S DAY OBSERVED HOLIDAY: 4 HRS. PAY $55.80 $40.80 $96.60 $0.00 $0.00 $0.00 $0.00
BRICKLAYER Work on high stacks: 22% per hour additional $45.20 $33.26 $78.46 $0.00 $0.00 $0.00 $0.00
CARPENTER $57.42 $34.17 $91.59 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $53.21 $33.42 $86.63 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $44.87 $30.15 $75.02 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN & CABLE SPLICER $57.70 $45.92 $103.62 $0.00 $0.00 $0.00 $0.00
ELEVATOR A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of B. Eight Paid $71.85 $38.44 $110.29 $0.00 $0.00 $0.00 $0.00
GLAZIER (OCEAN COUNTY) WORK AT 30 FT. ABOVE THE WORKING SURFACE, OR ON A SWING STAGE: $1.00 PER HOUR ADDITIONAL $49.96 $35.11 $85.07 $0.00 $0.00 $0.00 $0.00
GLAZIER (OCEAN COUNTY:) WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR ADDITIONAL. WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING $52.68 $31.29 $83.97 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $53.24 $38.40 $91.64 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $52.24 $50.32 $102.56 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $54.24 $38.40 $92.64 $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN $35.75 $30.22 $65.97 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE $36.50 $30.22 $66.72 $0.00 $0.00 $0.00 $0.00
PAINTER $45.55 $29.86 $75.41 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (OCEAN COUNTY $59.57 $46.45 $106.02 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (OCEAN COUNTY) $56.30 $50.76 $107.06 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: SERVICE AND REPAIR (OCEAN COUNTY $46.23 $29.23 $75.46 $0.00 $0.00 $0.00 $0.00
PLASTERER $38.37 $31.64 $70.01 $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (OCEAN COUNTY $59.57 $46.45 $106.02 $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (OCEAN COUNTY) $56.30 $50.76 $107.06 $0.00 $0.00 $0.00 $0.00
PLUMBER: SERVICE AND REPAIR (OCEAN COUNTY $46.23 $29.23 $75.46 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE; DRILL; ELEVATING GRADER; EXCAVATOR; FRONT E $61.72 $37.50 $99.22 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE; HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER; S $60.13 $37.50 $97.63 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR; FORKLIFT; FRONT END LOADER; LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTO $58.22 $37.50 $95.72 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR; FARM TRACTOR; FRONT END LOADER; HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDO $56.59 $37.50 $94.09 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER $52.88 $37.50 $90.38 $0.00 $0.00 $0.00 $0.00
ROOFER: ALL OTHER WORK MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION $46.03 $34.27 $80.30 $0.00 $0.00 $0.00 $0.00
ROOFER: SHINGLES MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, O $35.95 $21.85 $57.80 $0.00 $0.00 $0.00 $0.00
ROOFER: SLATE AND TILE MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION $38.95 $21.85 $60.80 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $59.08 $47.06 $106.14 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $59.19 $36.51 $95.70 $0.00 $0.00 $0.00 $0.00
TILE SETTER $52.31 $38.01 $90.32 $0.00 $0.00 $0.00 $0.00
View all WDs for Ocean → Revision history →