Wage Determination NJ20260034-16037-bld

Hunterdon, NJ · building · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination NJ20260034-16037-bld covers 37 trade classifications for building construction in Hunterdon, NJ. Total packages (base + fringe) range from $49.99/hr to $113.99/hr, with the highest going to ELECTRICIAN: CABLE SPLICER (HUNTERDON COUNTY (Townships of Alexandria and Bethlehem; Boroughs of Bloomsbury and Califon; Town of Clinton; Township of. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: NJ20260034-16037-bld
Revision: 2
Type: building
County: Hunterdon
State: NJ
Effective: May 17, 2026
Trades covered: 37
Highest rate: $113.99/hr
Official source: SAM.gov reference NJ20260034View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and mach $28.37 $21.62 $49.99 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR (HUNTERDON COUNTY (does not include the Borough of Califon; Township of PAID HOLIDAYS: The last day prior to th $55.80 $40.80 $96.60 $0.00 $0.00 $0.00 $0.00
BRICKLAYER Work on high stacks: 22% per hour additional $45.20 $33.26 $78.46 $0.00 $0.00 $0.00 $0.00
CARPENTER $57.42 $34.17 $91.59 $0.00 $0.00 $0.00 $0.00
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter $57.42 $34.17 $91.59 $0.00 $0.00 $0.00 $0.00
CEMENT MASON $49.60 $37.96 $87.56 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $44.87 $30.15 $75.02 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (HUNTERDON COUNTY (Township of Delaware; Township of East Amwell; Borough of Flemington; City of Lambertville; Township of Raritan; Boroug $63.82 $41.99 $105.81 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (HUNTERDON COUNTY (Townships of Alexandria and Bethlehem; Boroughs of Bloomsbury and Califon; Town of Clinton; Township of Clinton; Townsh $65.43 $42.86 $108.29 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: CABLE SPLICER (HUNTERDON COUNTY (Townships of Alexandria and Bethlehem; Boroughs of Bloomsbury and Califon; Town of Clinton; Township of $69.72 $44.27 $113.99 $0.00 $0.00 $0.00 $0.00
ELEVATOR a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving D $61.41 $38.44 $99.85 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING (Hunterdon County) $49.94 $50.32 $100.26 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING (Hunterdon County) $53.24 $38.40 $91.64 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (Hunterdon County) $52.24 $50.32 $102.56 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (Hunterdon County) $54.24 $38.40 $92.64 $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN $35.75 $30.22 $65.97 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE $36.50 $30.22 $66.72 $0.00 $0.00 $0.00 $0.00
PAINTER $45.55 $29.86 $75.41 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDING HVAC PIPE INSTALLATION (HUNTERDON COUNTY (south of a line drawn from a point where Bridge St. crosses the Delaware River, contin $59.57 $46.45 $106.02 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION HUNTERDON COUNTY (north of a line drawn from a point where Bridge St. crosses the Delaware River, continu $56.34 $50.80 $107.14 $0.00 $0.00 $0.00 $0.00
PLASTERER $38.37 $31.64 $70.01 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDING HVAC PIPE INSTALLATION (HUNTERDON COUNTY (north of a line drawn from a point where Bridge St. crosses the Delaware River, continuin $62.09 $45.05 $107.14 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDING HVAC PIPE INSTALLATION (HUNTERDON COUNTY (south of a line drawn from a point where Bridge St. crosses the Delaware River, continuin $59.57 $46.45 $106.02 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: SERVICE AND REPAIR (HUNTERDON COUNTY (south of a line drawn from a point where Bridge St. crosses the Delaware River, continuing a $46.23 $29.23 $75.46 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE; DRILL; ELEVATING GRADER; EXCAVATOR; FRONT E $61.72 $37.50 $99.22 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE; HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER; S $60.13 $37.50 $97.63 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR; FORKLIFT; FRONT END LOADER; LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTO $58.22 $37.50 $95.72 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR; FARM TRACTOR; FRONT END LOADER; HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDO $56.59 $37.50 $94.09 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER $52.88 $37.50 $90.38 $0.00 $0.00 $0.00 $0.00
ROOFER: ALL OTHER Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those day $46.03 $34.27 $80.30 $0.00 $0.00 $0.00 $0.00
ROOFER: Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which $35.95 $21.85 $57.80 $0.00 $0.00 $0.00 $0.00
ROOFER: SLATE AND Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those day $38.95 $21.85 $60.80 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $59.08 $47.06 $106.14 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $59.19 $36.51 $95.70 $0.00 $0.00 $0.00 $0.00
TILE SETTER $64.90 $37.28 $102.18 $0.00 $0.00 $0.00 $0.00
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures $58.84 $35.06 $93.90 $0.00 $0.00 $0.00 $0.00
Work welding or using a cutting torch: $1.00 per hour additional. Work on a swing stage scaffold; on a pipe scaffold providing the working height of t $52.68 $31.29 $83.97 $0.00 $0.00 $0.00 $0.00
View all WDs for Hunterdon → Revision history →