Wage Determination NH20260022-15430-bld
Rockingham, NH · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination NH20260022-15430-bld covers 24 trade classifications for building construction in Rockingham, NH. Total packages (base + fringe) range from $19.22/hr to $112.61/hr, with the highest going to CREDIT. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: NH20260022-15430-bld
Revision: 1
Type: building
County: Rockingham
State: NH
Effective: May 17, 2026
Trades covered: 24
Highest rate: $112.61/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $44.36 | $36.63 | $80.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $42.83 | $25.29 | $68.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $43.91 | $28.47 | $72.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION AND FORM WORK (EXCLUDES DRYWALL HANGING AND DRYWALL FINISHING/TAPING | $24.47 | $8.55 | $33.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $22.04 | $9.70 | $31.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| CREDIT | $74.17 | $38.44 | $112.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $25.00 | $0.00 | $25.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | $25.00 | $0.00 | $25.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $36.12 | $22.92 | $59.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $26.75 | $3.48 | $30.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $33.65 | $26.12 | $59.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $25.40 | $21.43 | $46.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $16.52 | $4.74 | $21.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.02 | $4.25 | $28.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $27.42 | $3.83 | $31.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $22.25 | $2.13 | $24.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $23.56 | $3.28 | $26.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $18.10 | $1.58 | $19.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $22.99 | $3.28 | $26.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $45.76 | $26.19 | $71.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $26.72 | $5.56 | $32.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 24.88 5.46 ROOFER | $19.22 | $0.00 | $19.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $31.29 | $9.78 | $41.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| WATERPROOFER | $26.69 | $0.00 | $26.69 | $0.00 | $0.00 | $0.00 | $0.00 |