Wage Determination NH20260021-17729-bld
Hillsborough, NH · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination NH20260021-17729-bld covers 24 trade classifications for building construction in Hillsborough, NH. Total packages (base + fringe) range from $20.80/hr to $112.61/hr, with the highest going to CREDIT. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: NH20260021-17729-bld
Revision: 1
Type: building
County: Hillsborough
State: NH
Effective: May 17, 2026
Trades covered: 24
Highest rate: $112.61/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $44.36 | $36.63 | $80.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $42.83 | $25.29 | $68.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $43.91 | $28.47 | $72.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $24.43 | $6.49 | $30.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $27.70 | $2.61 | $30.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| CREDIT | $74.17 | $38.44 | $112.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $28.67 | $11.69 | $40.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $36.12 | $22.92 | $59.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $27.74 | $3.74 | $31.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $22.60 | $19.89 | $42.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $24.05 | $12.75 | $36.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $17.46 | $9.86 | $27.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $17.01 | $4.43 | $21.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.08 | $4.75 | $28.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $27.42 | $3.83 | $31.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $22.54 | $2.29 | $24.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $23.56 | $3.28 | $26.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $20.00 | $3.28 | $23.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $22.99 | $3.28 | $26.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $25.17 | $11.87 | $37.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $23.97 | $9.68 | $33.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 33.83 10.09 ROOFER | $17.55 | $3.25 | $20.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $31.29 | $9.78 | $41.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| WATERPROOFER | $31.22 | $3.70 | $34.92 | $0.00 | $0.00 | $0.00 | $0.00 |