Wage Determination NH20260018-17903-bld
Grafton, NH · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination NH20260018-17903-bld covers 17 trade classifications for building construction in Grafton, NH. Total packages (base + fringe) range from $18.87/hr to $112.61/hr, with the highest going to CREDIT. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: NH20260018-17903-bld
Revision: 1
Type: building
County: Grafton
State: NH
Effective: May 17, 2026
Trades covered: 17
Highest rate: $112.61/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $44.36 | $36.63 | $80.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $30.45 | $3.64 | $34.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $24.86 | $12.82 | $37.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $23.71 | $9.71 | $33.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| CREDIT | $74.17 | $38.44 | $112.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $25.29 | $3.91 | $29.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $29.89 | $10.70 | $40.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $33.65 | $26.12 | $59.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $17.02 | $6.99 | $24.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $19.60 | $2.73 | $22.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $20.85 | $2.61 | $23.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.00 | $2.34 | $23.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $16.87 | $2.02 | $18.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $45.76 | $26.19 | $71.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $24.77 | $10.27 | $35.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 24.77 11.89 ROOFER | $18.87 | $0.00 | $18.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $17.43 | $3.60 | $21.03 | $0.00 | $0.00 | $0.00 | $0.00 |