Wage Determination NE20260081-16007-bld

Johnson, NE · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination NE20260081-16007-bld covers 20 trade classifications for building construction in Johnson, NE. Total packages (base + fringe) range from $15.17/hr to $94.32/hr, with the highest going to ELEVATOR MECHANIC FOOTNOTE: A. VACATION PAY: 8% FOR PERSONS WITH 5 OR MORE YEARS OF SERVICE, 6% FOR PERSONS WITH LESS THAN 5 YEARS OF SERVICE. B. PAID. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: NE20260081-16007-bld
Revision: 1
Type: building
County: Johnson
State: NE
Effective: May 17, 2026
Trades covered: 20
Highest rate: $94.32/hr
Official source: SAM.gov reference NE20260081View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $34.80 $19.94 $54.74 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $16.10 $1.46 $17.56 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.54 $1.41 $18.95 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN $35.00 $18.88 $53.88 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN $35.30 $18.91 $54.21 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN $35.60 $18.94 $54.54 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN $36.00 $18.99 $54.99 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. VACATION PAY: 8% FOR PERSONS WITH 5 OR MORE YEARS OF SERVICE, 6% FOR PERSONS WITH LESS THAN 5 YEARS OF SERVICE. B. PAID $55.88 $38.44 $94.32 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.96 $4.50 $27.46 $0.00 $0.00 $0.00 $0.00
LABORER $24.00 $13.48 $37.48 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.54 $3.63 $18.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.82 $2.22 $24.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.58 $0.94 $17.52 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $46.25 $21.10 $67.35 $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDES HVAC PIPE INSTALLATION $44.26 $16.90 $61.16 $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDES HVAC PIPE INSTALLATION $46.25 $21.10 $67.35 $0.00 $0.00 $0.00 $0.00
ROOFER $14.52 $0.65 $15.17 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION $36.73 $18.09 $54.82 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION $39.65 $19.87 $59.52 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP, LOWBOY AND TANDEM $14.56 $1.68 $16.24 $0.00 $0.00 $0.00 $0.00
View all WDs for Johnson → Revision history →