Wage Determination ND20260014-17799-bld
Grand Forks, ND · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination ND20260014-17799-bld covers 23 trade classifications for building construction in Grand Forks, ND. Total packages (base + fringe) range from $15.32/hr to $79.14/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: ND20260014-17799-bld
Revision: 2
Type: building
County: Grand Forks
State: ND
Effective: May 17, 2026
Trades covered: 23
Highest rate: $79.14/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $48.00 | $31.14 | $79.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $23.47 | $12.34 | $35.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $19.16 | $3.88 | $23.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $35.33 | $18.40 | $53.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $21.48 | $6.66 | $28.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $19.60 | $4.34 | $23.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $37.41 | $18.62 | $56.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR - MECHANICAL | $15.80 | $2.60 | $18.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $35.95 | $33.11 | $69.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $12.99 | $2.81 | $15.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $15.32 | $0.00 | $15.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.54 | $3.41 | $17.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.00 | $3.82 | $29.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $26.18 | $9.39 | $35.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $23.06 | $15.47 | $38.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $23.75 | $0.00 | $23.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER, EXCLUDES DRYWALL FINISHING/TAPING | $21.86 | $8.41 | $30.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $43.94 | $20.46 | $64.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $30.72 | $18.33 | $49.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $21.64 | $4.98 | $26.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $34.34 | $22.67 | $57.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 27.27 7.76 ROOFER | $16.37 | $2.84 | $19.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $19.81 | $5.42 | $25.23 | $0.00 | $0.00 | $0.00 | $0.00 |