Wage determination ND20260001-17688-hwy covers 24 trade classifications for highway construction in McLean, ND. Total packages (base + fringe) range from $34.30/hr to $79.90/hr, with the highest going to ELECTRICIAN: CABLE SPLICER:: ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, DIVIDE, DUNN, EMMONS, GOLDEN VALLEY, GRANT, HETTINGER, MCHENRY, MCKENZIE, MCLE. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: ND20260001-17688-hwy
Revision: 2
Type: highway
County: McLean
State: ND
Effective: May 17, 2026
Trades covered: 24
Highest rate: $79.90/hr
Official source: SAM.gov reference ND20260001View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $38.70 $9.00 $47.70 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $38.70 $9.00 $47.70 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: CABLE SPLICER:: ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, DIVIDE, DUNN, EMMONS, GOLDEN VALLEY, GRANT, HETTINGER, MCHENRY, MCKENZIE, MCLE $55.35 $24.55 $79.90 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: Cass County $37.41 $16.75 $54.16 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ELECTRICIAN:: ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, DIVIDE, DUNN, EMMONS, GOLDEN VALLEY, GRANT, HETTINGER, MCHENRY, MCKENZIE, MCLEAN $55.35 $24.55 $79.90 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ELECTRICIAN:: BURLIEGH, MORTON, STARK:.$ 55.35 24.55 ELECTRICIAN: CABLE SPLICER:: BURLIEGH, MORTON, STARK $55.35 $24.55 $79.90 $0.00 $0.00 $0.00 $0.00
LABORER: Group 1 $30.90 $3.40 $34.30 $0.00 $0.00 $0.00 $0.00
LABORER: Group 2 $31.15 $3.40 $34.55 $0.00 $0.00 $0.00 $0.00
LABORER: Group 3 $31.30 $3.40 $34.70 $0.00 $0.00 $0.00 $0.00
LABORER: Group 4 $32.05 $3.40 $35.45 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: CABLE SPLICER $55.35 $24.55 $79.90 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $31.32 $19.39 $50.71 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINE EQUIPMENT OPERATOR $47.00 $22.21 $69.21 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $55.35 $24.55 $79.90 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1: All Cranes 60 tons and over, Cranes doing piling, sheeting, dragline/clam work, Derrick, Gentry Crane Operator, Heli $36.65 $22.45 $59.10 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2: All Cranes 59 tons and under, Backhoe Operator 3 CY. and over, Creter Crane, Dredge Operator 12' and Over,Equipment $35.25 $22.45 $57.70 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3: Lazer-Screed Operator, Asphalt Paving Machine Operator, Asphalt Plant Operator, Automated Grade Trimmer, Backhoe Ope $35.00 $22.45 $57.45 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4: Articulated/Off Road Hauler, Asphalt Dump Person, Asphalt Paving Screed Operator, Backhoe - up to and including 1/2 $34.85 $22.45 $57.30 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 5: Boom Truck- A- Frame or Hydraulic 2 tons up to and including 7 tons, Broom-Self propelled, Concrete Saw, Cure Bridge $34.00 $22.45 $56.45 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 6: Brakeman or Switchman, Dredge or Tugboat Deckhand, Drill Truck Gravel/Testing Operator, Form Trench Digger, Gunite O $33.20 $22.45 $55.65 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: Euclid over 20 yds $35.79 $19.28 $55.07 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: Single Axle Trucks $33.84 $19.28 $53.12 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: Tandem Tri Axle Semi, Low Boy and Off Road Heavy Duty End Dumps 20 yds & under $34.27 $19.28 $53.55 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: Tandem Tri/Axle Truck $33.96 $19.28 $53.24 $0.00 $0.00 $0.00 $0.00