Wage Determination NC20260046-16174-bld
Greene, NC · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination NC20260046-16174-bld covers 22 trade classifications for building construction in Greene, NC. Total packages (base + fringe) range from $9.41/hr to $47.75/hr, with the highest going to IRONWORKER, STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: NC20260046-16174-bld
Revision: 1
Type: building
County: Greene
State: NC
Effective: May 17, 2026
Trades covered: 22
Highest rate: $47.75/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $19.00 | $0.00 | $19.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 15.91 3.87 CARPENTER | $12.43 | $1.80 | $14.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $15.50 | $0.00 | $15.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER | $13.83 | $0.00 | $13.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $18.31 | $3.06 | $21.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $19.69 | $2.25 | $21.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $29.75 | $18.00 | $47.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.20 | $0.00 | $10.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE & IRRIGATION | $9.13 | $0.28 | $9.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER-BRICK/CEMENT/CONCRETE | $12.00 | $0.00 | $12.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.35 | $2.80 | $16.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.23 | $2.16 | $20.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $16.00 | $1.87 | $17.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $19.77 | $4.48 | $24.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $13.86 | $0.00 | $13.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $15.72 | $1.49 | $17.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $16.17 | $0.25 | $16.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.35 | $0.00 | $12.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $31.66 | $12.69 | $44.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $19.70 | $2.34 | $22.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 15.81 1.40 ROOFER | $11.06 | $1.26 | $12.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $13.38 | $1.48 | $14.86 | $0.00 | $0.00 | $0.00 | $0.00 |