Revision History — WD NC20260009-16184-bld
New Hanover, NC · building construction
Current revision: 1. Wage determinations are updated annually (or more frequently) to reflect changes in local prevailing wages.
Revision 1
Current
May 18, 2026
Revision 1 — published 2026-05-17. Source: SAM.gov WDOL (NC20260009).
How to Use WD Revision History
The revision number that applies to your contract is determined by the contract award date (or modification date if the scope changed). Use the revision that was current on the date your contract was awarded.
If the wage determination has been updated since your contract was awarded, you are generally not required to update wages unless your contract is modified.