Wage Determination MT20260073-17826-hvy
Toole, MT · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MT20260073-17826-hvy covers 25 trade classifications for heavy construction in Toole, MT. Total packages (base + fringe) range from $16.44/hr to $62.13/hr, with the highest going to IRONWORKER: REINFORCING AND STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MT20260073-17826-hvy
Revision: 1
Type: heavy
County: Toole
State: MT
Effective: May 17, 2026
Trades covered: 25
Highest rate: $62.13/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $42.23 | $16.20 | $58.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $41.15 | $16.20 | $57.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $24.34 | $10.40 | $34.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $23.94 | $10.40 | $34.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $23.47 | $10.40 | $33.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $24.30 | $7.80 | $32.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $21.13 | $7.00 | $28.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $38.51 | $17.09 | $55.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $36.83 | $25.30 | $62.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $17.99 | $5.90 | $23.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE AND IRRIGATION | $15.14 | $1.30 | $16.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $18.13 | $5.90 | $24.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN | $29.09 | $8.36 | $37.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN | $48.65 | $9.40 | $58.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE | $26.14 | $8.05 | $34.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $23.53 | $8.05 | $31.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $27.29 | $8.55 | $35.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: EXCAVATOR | $26.84 | $9.89 | $36.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $25.44 | $8.45 | $33.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $25.01 | $7.78 | $32.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $27.29 | $8.55 | $35.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCRAPER | $27.69 | $8.55 | $36.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S | $38.98 | $16.20 | $55.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE | $40.07 | $16.20 | $56.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK. ZONE A. ZONE B: ADD $3.05 PER HOUR TO ZONE A RATES ZONE C: ADD $4.85 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED | $45.28 | $13.40 | $58.68 | $0.00 | $0.00 | $0.00 | $0.00 |