Wage Determination MT20260073-17826-hvy

Toole, MT · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MT20260073-17826-hvy covers 25 trade classifications for heavy construction in Toole, MT. Total packages (base + fringe) range from $16.44/hr to $62.13/hr, with the highest going to IRONWORKER: REINFORCING AND STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MT20260073-17826-hvy
Revision: 1
Type: heavy
County: Toole
State: MT
Effective: May 17, 2026
Trades covered: 25
Highest rate: $62.13/hr
Official source: SAM.gov reference MT20260073View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $42.23 $16.20 $58.43 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $41.15 $16.20 $57.35 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $24.34 $10.40 $34.74 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $23.94 $10.40 $34.34 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $23.47 $10.40 $33.87 $0.00 $0.00 $0.00 $0.00
CARPENTER $24.30 $7.80 $32.10 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $21.13 $7.00 $28.13 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.51 $17.09 $55.60 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $36.83 $25.30 $62.13 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.99 $5.90 $23.89 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $15.14 $1.30 $16.44 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.13 $5.90 $24.03 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $29.09 $8.36 $37.45 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $48.65 $9.40 $58.05 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $26.14 $8.05 $34.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $23.53 $8.05 $31.58 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $27.29 $8.55 $35.84 $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $26.84 $9.89 $36.73 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $25.44 $8.45 $33.89 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $25.01 $7.78 $32.79 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $27.29 $8.55 $35.84 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $27.69 $8.55 $36.24 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $38.98 $16.20 $55.18 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE $40.07 $16.20 $56.27 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK. ZONE A. ZONE B: ADD $3.05 PER HOUR TO ZONE A RATES ZONE C: ADD $4.85 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED $45.28 $13.40 $58.68 $0.00 $0.00 $0.00 $0.00
View all WDs for Toole → Revision history →