Wage Determination MT20260067-17853-hvy

Missoula, MT · heavy · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MT20260067-17853-hvy covers 20 trade classifications for heavy construction in Missoula, MT. Total packages (base + fringe) range from $24.12/hr to $71.06/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MT20260067-17853-hvy
Revision: 2
Type: heavy
County: Missoula
State: MT
Effective: May 17, 2026
Trades covered: 20
Highest rate: $71.06/hr
Official source: SAM.gov reference MT20260067View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $42.23 $16.20 $58.43 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $41.15 $16.20 $57.35 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $23.47 $10.40 $33.87 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.75 $32.31 $71.06 $0.00 $0.00 $0.00 $0.00
CARPENTER. ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FRO $36.49 $14.33 $50.82 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.71 $17.94 $58.65 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $32.08 $29.06 $61.14 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $16.91 $9.08 $25.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT ROLLER $22.39 $3.96 $26.35 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $22.12 $8.37 $30.49 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.67 $8.05 $33.72 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.67 $6.54 $29.21 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND SPRAY $25.00 $0.00 $25.00 $0.00 $0.00 $0.00 $0.00
PLUMBER $39.38 $16.23 $55.61 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: EXCAVATOR, CRANE OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJ $23.94 $10.40 $34.34 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $24.34 $10.40 $34.74 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1:CRANES, 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $38.98 $16.20 $55.18 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1:CRANES, 45-74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $40.07 $16.20 $56.27 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER WATER TRUCK ZONE A. ZONE B: ADD $3.05 PER HOUR TO ZONE A RATES ZONE C: ADD $4.85 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED F $32.88 $13.98 $46.86 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.38 $4.74 $24.12 $0.00 $0.00 $0.00 $0.00