Wage Determination MT20260064-17835-bld

Yellowstone, MT · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MT20260064-17835-bld covers 17 trade classifications for building construction in Yellowstone, MT. Total packages (base + fringe) range from $17.00/hr to $106.05/hr, with the highest going to YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; ME. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MT20260064-17835-bld
Revision: 1
Type: building
County: Yellowstone
State: MT
Effective: May 17, 2026
Trades covered: 17
Highest rate: $106.05/hr
Official source: SAM.gov reference MT20260064View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $38.75 $32.31 $71.06 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $22.50 $6.01 $28.51 $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, FORMWORK, AND DRYWALL HANGING $32.05 $15.02 $47.07 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $28.15 $10.59 $38.74 $0.00 $0.00 $0.00 $0.00
HEAT AND FROST INSULATOR $43.81 $21.87 $65.68 $0.00 $0.00 $0.00 $0.00
LABORER, ZONE 1: COMMON OR GENERAL ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE $23.05 $12.72 $35.77 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $17.51 $3.71 $21.22 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND SPRAY $26.39 $19.39 $45.78 $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $17.00 $0.00 $17.00 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION $44.35 $21.87 $66.22 $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDES HVAC PIPE INSTALLATION $41.00 $20.47 $61.47 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO $31.51 $16.20 $47.71 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: EXCAVATOR, BACKHOE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $32.88 $16.20 $49.08 $0.00 $0.00 $0.00 $0.00
ROOFER EMPLOYER PAYS 80% OF HEALTH INSURANCE PREMIUMS $24.00 $9.16 $33.16 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.07 $22.07 $62.14 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $39.97 $24.40 $64.37 $0.00 $0.00 $0.00 $0.00
YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; ME $67.61 $38.44 $106.05 $0.00 $0.00 $0.00 $0.00