Wage Determination MT20260039-17758-bld

Lake, MT · building · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MT20260039-17758-bld covers 23 trade classifications for building construction in Lake, MT. Total packages (base + fringe) range from $15.02/hr to $106.05/hr, with the highest going to ELEVATOR MECHANIC FOOTNOTE: ADDITIONAL FRINGE BENEFITS DUE: A. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF TH. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MT20260039-17758-bld
Revision: 2
Type: building
County: Lake
State: MT
Effective: May 17, 2026
Trades covered: 23
Highest rate: $106.05/hr
Official source: SAM.gov reference MT20260039View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $42.00 $16.20 $58.20 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $38.00 $16.20 $54.20 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $21.51 $16.20 $37.71 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.75 $32.31 $71.06 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.11 $16.69 $49.80 $0.00 $0.00 $0.00 $0.00
CARPENTER $18.76 $0.00 $18.76 $0.00 $0.00 $0.00 $0.00
CARPENTER:. ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FR $32.05 $15.02 $47.07 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.27 $1.50 $19.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.71 $17.94 $58.65 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: ADDITIONAL FRINGE BENEFITS DUE: A. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF TH $67.61 $38.44 $106.05 $0.00 $0.00 $0.00 $0.00
HEAT AND FROST INSULATOR $43.81 $21.87 $65.68 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND REINFORCING $32.08 $29.06 $61.14 $0.00 $0.00 $0.00 $0.00
LABORER, ZONE 1: MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING TH $23.05 $12.72 $35.77 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.02 $0.00 $15.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $20.39 $4.38 $24.77 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $21.44 $8.05 $29.49 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $19.18 $0.00 $19.18 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION $39.38 $16.23 $55.61 $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDES HVAC PIPE INSTALLATION $36.13 $15.98 $52.11 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC $40.00 $16.20 $56.20 $0.00 $0.00 $0.00 $0.00
ROOFER $20.20 $0.00 $20.20 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.00 $22.07 $62.07 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $18.88 $4.66 $23.54 $0.00 $0.00 $0.00 $0.00
View all WDs for Lake → Revision history →