Wage Determination MT20260037-17750-bld
Hill, MT · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MT20260037-17750-bld covers 26 trade classifications for building construction in Hill, MT. Total packages (base + fringe) range from $17.25/hr to $71.06/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MT20260037-17750-bld
Revision: 1
Type: building
County: Hill
State: MT
Effective: May 17, 2026
Trades covered: 26
Highest rate: $71.06/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $42.00 | $16.20 | $58.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $38.00 | $16.20 | $54.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $21.51 | $16.20 | $37.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $38.75 | $32.31 | $71.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $30.55 | $15.75 | $46.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $22.69 | $0.00 | $22.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER Zone Definition: The hourly rate applicable to each project is determined by measuring the road miles over the shortest practical route from | $32.05 | $15.03 | $47.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.27 | $1.50 | $19.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $38.51 | $17.09 | $55.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $20.22 | $6.58 | $26.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER | $16.02 | $6.00 | $22.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| HEAT AND FROST INSULATOR | $43.81 | $21.87 | $65.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $36.83 | $25.30 | $62.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $16.64 | $4.12 | $20.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $18.37 | $5.94 | $24.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: EXCAVATOR | $22.98 | $5.57 | $28.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $21.44 | $8.05 | $29.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $19.18 | $0.00 | $19.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $46.45 | $19.92 | $66.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $25.75 | $10.87 | $36.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $26.34 | $10.30 | $36.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC | $40.00 | $16.20 | $56.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $15.44 | $1.81 | $17.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $40.00 | $22.07 | $62.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $39.97 | $24.40 | $64.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $18.88 | $4.66 | $23.54 | $0.00 | $0.00 | $0.00 | $0.00 |