Wage Determination MT20260014-17748-res
Big Horn, MT · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MT20260014-17748-res covers 9 trade classifications for residential construction in Big Horn, MT. Total packages (base + fringe) range from $9.90/hr to $14.70/hr, with the highest going to PLUMBER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MT20260014-17748-res
Revision: 1
Type: residential
County: Big Horn
State: MT
Effective: May 17, 2026
Trades covered: 9
Highest rate: $14.70/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $10.38 | $1.57 | $11.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $10.38 | $1.57 | $11.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $12.77 | $1.20 | $13.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $8.70 | $1.20 | $9.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH | $9.86 | $0.86 | $10.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: DRYWALL TAPER/FINISHER | $9.96 | $0.86 | $10.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $12.70 | $2.00 | $14.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BACKHOE, FRONT END LOADER, SHOVEL | $11.46 | $1.57 | $13.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $10.54 | $0.25 | $10.79 | $0.00 | $0.00 | $0.00 | $0.00 |