Wage Determination MT20260007-17745-res
Roosevelt, MT · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MT20260007-17745-res covers 12 trade classifications for residential construction in Roosevelt, MT. Total packages (base + fringe) range from $9.73/hr to $14.59/hr, with the highest going to PLUMBER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MT20260007-17745-res
Revision: 1
Type: residential
County: Roosevelt
State: MT
Effective: May 17, 2026
Trades covered: 12
Highest rate: $14.59/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $11.35 | $1.15 | $12.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $9.30 | $1.47 | $10.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $10.90 | $1.73 | $12.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GENERAL | $8.60 | $1.13 | $9.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $9.77 | $1.06 | $10.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $12.60 | $1.99 | $14.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: FORKLIFT | $10.57 | $1.62 | $12.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: RUBBER TIRED FRONT END LOADER | $10.76 | $1.62 | $12.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: RUBBER TIRED FRONT END LOADER | $10.47 | $1.62 | $12.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $10.81 | $1.96 | $12.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: FLAT TRUCKS | $9.71 | $1.35 | $11.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: FLAT TRUCKS:..$ 9.51 1.35 TRUCK DRIVERS: PICKUP HAULING MATERIALS | $9.46 | $1.35 | $10.81 | $0.00 | $0.00 | $0.00 | $0.00 |