Wage Determination MT20260006-17814-res
Treasure, MT · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MT20260006-17814-res covers 13 trade classifications for residential construction in Treasure, MT. Total packages (base + fringe) range from $9.90/hr to $14.70/hr, with the highest going to PLUMBER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MT20260006-17814-res
Revision: 1
Type: residential
County: Treasure
State: MT
Effective: May 17, 2026
Trades covered: 13
Highest rate: $14.70/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $13.45 | $0.55 | $14.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $10.38 | $1.57 | $11.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $12.77 | $1.70 | $14.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $8.70 | $1.20 | $9.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $9.86 | $0.76 | $10.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: (PERFA-TAPER) | $9.96 | $0.76 | $10.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $12.70 | $2.00 | $14.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/LOADER 1 CU YD & UNDER | $11.46 | $1.57 | $13.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $11.27 | $1.57 | $12.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $10.54 | $0.25 | $10.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| SIMILAR DUMP WAGON | $10.09 | $1.52 | $11.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| SIMILAR DUMP WAGON | $10.22 | $1.52 | $11.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS | $10.24 | $1.52 | $11.76 | $0.00 | $0.00 | $0.00 | $0.00 |