Wage Determination MS20260134-15652-hwy

Hinds, MS · highway · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MS20260134-15652-hwy covers 39 trade classifications for highway construction in Hinds, MS. Total packages (base + fringe) range from $9.69/hr to $41.74/hr, with the highest going to TRAFFIC SIGNALIZATION. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MS20260134-15652-hwy
Revision: 1
Type: highway
County: Hinds
State: MS
Effective: May 17, 2026
Trades covered: 39
Highest rate: $41.74/hr
Official source: SAM.gov reference MS20260134View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $13.73 $0.00 $13.73 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.93 $0.00 $13.93 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.04 $5.87 $29.91 $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $11.81 $0.00 $11.81 $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $12.07 $0.00 $12.07 $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $12.13 $0.00 $12.13 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.47 $0.00 $15.47 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING; AND GRADE CHECKING $10.32 $0.00 $10.32 $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $9.69 $0.00 $9.69 $0.00 $0.00 $0.00 $0.00
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $10.39 $0.00 $10.39 $0.00 $0.00 $0.00 $0.00
LABORER: LUTEMAN $12.88 $0.00 $12.88 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.11 $0.00 $12.11 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.44 $0.00 $13.44 $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $14.71 $0.00 $14.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.01 $0.00 $16.01 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $11.64 $0.00 $11.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $9.75 $0.00 $9.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $13.87 $0.00 $13.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $14.38 $0.00 $14.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $21.33 $0.00 $21.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $10.25 $0.00 $10.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.31 $0.00 $14.31 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRINDING/GROOVING MACHINE $15.90 $0.00 $15.90 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $11.96 $0.00 $11.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $15.20 $0.00 $15.20 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $14.68 $0.00 $14.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: MIXER $14.25 $0.00 $14.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $12.13 $0.00 $12.13 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $11.59 $0.00 $11.59 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $11.53 $0.00 $11.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $12.25 $0.00 $12.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $11.81 $0.00 $11.81 $0.00 $0.00 $0.00 $0.00
TRAFFIC SIGNALIZATION $30.35 $11.39 $41.74 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.39 $0.00 $11.39 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $14.06 $0.00 $14.06 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $12.56 $0.00 $12.56 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MECHANIC $13.00 $0.00 $13.00 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $14.60 $0.00 $14.60 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $10.00 $0.00 $10.00 $0.00 $0.00 $0.00 $0.00
View all WDs for Hinds → Revision history →