Wage Determination MS20260074-15685-hvy
George, MS · heavy · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination MS20260074-15685-hvy covers 10 trade classifications for heavy construction in George, MS. Total packages (base + fringe) range from $12.00/hr to $44.93/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MS20260074-15685-hvy
Revision: 2
Type: heavy
County: George
State: MS
Effective: May 17, 2026
Trades covered: 10
Highest rate: $44.93/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $16.54 | $0.00 | $16.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES | $14.98 | $0.00 | $14.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $33.30 | $11.63 | $44.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $18.50 | $0.00 | $18.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL | $21.00 | $8.81 | $29.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $12.71 | $0.00 | $12.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $12.00 | $0.00 | $12.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES | $14.68 | $0.00 | $14.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINES | $14.71 | $0.00 | $14.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $13.25 | $0.00 | $13.25 | $0.00 | $0.00 | $0.00 | $0.00 |