Wage Determination MS20260074-15660-hvy

Leake, MS · heavy · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MS20260074-15660-hvy covers 10 trade classifications for heavy construction in Leake, MS. Total packages (base + fringe) range from $12.00/hr to $44.93/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MS20260074-15660-hvy
Revision: 2
Type: heavy
County: Leake
State: MS
Effective: May 17, 2026
Trades covered: 10
Highest rate: $44.93/hr
Official source: SAM.gov reference MS20260074View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $16.54 $0.00 $16.54 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES $14.98 $0.00 $14.98 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.30 $11.63 $44.93 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $18.50 $0.00 $18.50 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $21.00 $8.81 $29.81 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES $12.71 $0.00 $12.71 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES $14.68 $0.00 $14.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINES $14.71 $0.00 $14.71 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES $13.25 $0.00 $13.25 $0.00 $0.00 $0.00 $0.00
View all WDs for Leake → Revision history →