Wage Determination MS20260073-15653-hvy
Holmes, MS · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MS20260073-15653-hvy covers 10 trade classifications for heavy construction in Holmes, MS. Total packages (base + fringe) range from $11.66/hr to $29.81/hr, with the highest going to IRONWORKER: STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MS20260073-15653-hvy
Revision: 1
Type: heavy
County: Holmes
State: MS
Effective: May 17, 2026
Trades covered: 10
Highest rate: $29.81/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $16.78 | $0.00 | $16.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES | $14.95 | $0.00 | $14.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $21.09 | $7.61 | $28.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $18.50 | $0.00 | $18.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL | $21.00 | $8.81 | $29.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $11.27 | $1.71 | $12.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $13.29 | $1.88 | $15.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES | $16.29 | $1.71 | $18.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINES | $16.31 | $0.00 | $16.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $11.66 | $0.00 | $11.66 | $0.00 | $0.00 | $0.00 | $0.00 |