Wage Determination MS20260072-15618-hvy

Choctaw, MS · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MS20260072-15618-hvy covers 10 trade classifications for heavy construction in Choctaw, MS. Total packages (base + fringe) range from $12.00/hr to $29.81/hr, with the highest going to IRONWORKER: STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MS20260072-15618-hvy
Revision: 1
Type: heavy
County: Choctaw
State: MS
Effective: May 17, 2026
Trades covered: 10
Highest rate: $29.81/hr
Official source: SAM.gov reference MS20260072View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $16.89 $0.00 $16.89 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES $16.24 $0.00 $16.24 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.36 $7.70 $27.06 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $18.50 $0.00 $18.50 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $21.00 $8.81 $29.81 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES $12.24 $0.00 $12.24 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES $13.19 $0.00 $13.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES $17.01 $0.00 $17.01 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINES $17.60 $0.00 $17.60 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
View all WDs for Choctaw → Revision history →