Wage Determination MS20260061-15688-hvy
Jackson, MS · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MS20260061-15688-hvy covers 11 trade classifications for heavy construction in Jackson, MS. Total packages (base + fringe) range from $15.05/hr to $34.61/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MS20260061-15688-hvy
Revision: 1
Type: heavy
County: Jackson
State: MS
Effective: May 17, 2026
Trades covered: 11
Highest rate: $34.61/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $16.57 | $0.00 | $16.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.75 | $0.00 | $17.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $27.16 | $7.45 | $34.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $20.63 | $0.00 | $20.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $19.00 | $0.00 | $19.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $15.05 | $0.00 | $15.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $14.04 | $1.92 | $15.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.89 | $0.00 | $17.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $18.85 | $1.18 | $20.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $22.66 | $4.66 | $27.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $16.03 | $0.95 | $16.98 | $0.00 | $0.00 | $0.00 | $0.00 |