Wage Determination MS20260047-15677-bld
Greene, MS · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination MS20260047-15677-bld covers 12 trade classifications for building construction in Greene, MS. Total packages (base + fringe) range from $10.88/hr to $44.93/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MS20260047-15677-bld
Revision: 2
Type: building
County: Greene
State: MS
Effective: May 17, 2026
Trades covered: 12
Highest rate: $44.93/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $15.00 | $1.88 | $16.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $20.00 | $0.00 | $20.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $33.30 | $11.63 | $44.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $24.05 | $12.29 | $36.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.00 | $1.88 | $10.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.98 | $0.00 | $12.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $12.52 | $0.75 | $13.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.00 | $1.32 | $19.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $15.17 | $0.00 | $15.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $30.41 | $11.47 | $41.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 19.95 0.68 PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $22.77 | $6.96 | $29.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $13.50 | $1.15 | $14.65 | $0.00 | $0.00 | $0.00 | $0.00 |