Wage Determination MS20260003-15670-hvy
Walthall, MS · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MS20260003-15670-hvy covers 1 trade classification for heavy construction in Walthall, MS. Total packages (base + fringe) range from $34.16/hr to $34.16/hr, with the highest going to SELF-PROPELLED HOPPER DREDGE, DRAG TENDER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MS20260003-15670-hvy
Revision: 1
Type: heavy
County: Walthall
State: MS
Effective: May 17, 2026
Trades covered: 1
Highest rate: $34.16/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| SELF-PROPELLED HOPPER DREDGE, DRAG TENDER | $25.20 | $8.96 | $34.16 | $0.00 | $0.00 | $0.00 | $0.00 |