Wage Determination MO20260069-15901-res
Polk, MO · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MO20260069-15901-res covers 12 trade classifications for residential construction in Polk, MO. Total packages (base + fringe) range from $16.00/hr to $67.90/hr, with the highest going to POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MO20260069-15901-res
Revision: 1
Type: residential
County: Polk
State: MO
Effective: May 17, 2026
Trades covered: 12
Highest rate: $67.90/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $33.67 | $19.48 | $53.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $23.58 | $20.20 | $43.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.00 | $0.00 | $16.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $32.40 | $19.11 | $51.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $23.32 | $11.56 | $34.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $22.77 | $11.56 | $34.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $19.75 | $11.76 | $31.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $39.35 | $15.72 | $55.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $45.48 | $22.42 | $67.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | $22.42 | $67.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $30.73 | $14.51 | $45.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $34.43 | $17.86 | $52.29 | $0.00 | $0.00 | $0.00 | $0.00 |