Wage Determination MO20260063-15721-res
Jackson, MO · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MO20260063-15721-res covers 14 trade classifications for residential construction in Jackson, MO. Total packages (base + fringe) range from $11.00/hr to $81.17/hr, with the highest going to PLUMBER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MO20260063-15721-res
Revision: 1
Type: residential
County: Jackson
State: MO
Effective: May 17, 2026
Trades covered: 14
Highest rate: $81.17/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $39.85 | $21.70 | $61.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $35.83 | $22.40 | $58.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.00 | $0.00 | $16.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $42.61 | $23.31 | $65.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.00 | $0.00 | $11.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $18.70 | $11.01 | $29.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $21.10 | $12.50 | $33.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $56.63 | $24.54 | $81.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $45.48 | $22.42 | $67.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | $22.42 | $67.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $38.45 | $22.29 | $60.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $27.37 | $8.14 | $35.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $45.85 | $25.50 | $71.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $42.93 | $27.52 | $70.45 | $0.00 | $0.00 | $0.00 | $0.00 |