Wage Determination MO20260060-15869-res
Bollinger, MO · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MO20260060-15869-res covers 8 trade classifications for residential construction in Bollinger, MO. Total packages (base + fringe) range from $15.53/hr to $79.12/hr, with the highest going to SHEET METAL WORKER: INSTALLATION OF HVAC DUCT AND HVAC SYSTEM. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MO20260060-15869-res
Revision: 1
Type: residential
County: Bollinger
State: MO
Effective: May 17, 2026
Trades covered: 8
Highest rate: $79.12/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $31.51 | $15.00 | $46.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $17.16 | $2.77 | $19.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $15.53 | $0.00 | $15.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $17.15 | $5.69 | $22.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH ONLY | $18.75 | $5.80 | $24.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: ROLLER | $18.75 | $5.80 | $24.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INSTALLATION OF HVAC DUCT AND HVAC SYSTEM | $34.43 | $17.86 | $52.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INSTALLATION OF HVAC DUCT AND HVAC SYSTEM | $52.00 | $27.12 | $79.12 | $0.00 | $0.00 | $0.00 | $0.00 |