Wage Determination MO20260059-15909-res
Stone, MO · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MO20260059-15909-res covers 9 trade classifications for residential construction in Stone, MO. Total packages (base + fringe) range from $15.53/hr to $61.55/hr, with the highest going to BRICKLAYER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MO20260059-15909-res
Revision: 1
Type: residential
County: Stone
State: MO
Effective: May 17, 2026
Trades covered: 9
Highest rate: $61.55/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $39.85 | $21.70 | $61.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $33.67 | $19.48 | $53.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $30.00 | $18.19 | $48.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $23.96 | $3.93 | $27.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $15.53 | $0.00 | $15.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $22.77 | $11.56 | $34.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH ONLY | $18.75 | $5.80 | $24.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: ROLLER | $18.75 | $5.80 | $24.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INSTALLATION OF HVAC DUCT AND HVAC SYSTEM | $27.37 | $8.14 | $35.51 | $0.00 | $0.00 | $0.00 | $0.00 |