Wage Determination MO20260012-15722-bld
Johnson, MO · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination MO20260012-15722-bld covers 27 trade classifications for building construction in Johnson, MO. Total packages (base + fringe) range from $22.71/hr to $99.13/hr, with the highest going to VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKS. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MO20260012-15722-bld
Revision: 2
Type: building
County: Johnson
State: MO
Effective: May 17, 2026
Trades covered: 27
Highest rate: $99.13/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 | $81.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $39.85 | $21.70 | $61.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $42.06 | $22.40 | $64.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $23.33 | $7.42 | $30.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 | $24.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $51.01 | $26.25 | $77.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $22.71 | $0.00 | $22.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $39.00 | $34.25 | $73.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $26.50 | $13.18 | $39.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $28.00 | $13.18 | $41.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $16.18 | $7.12 | $23.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | $7.47 | $31.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $24.47 | $0.00 | $24.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: WATER TRUCK | $28.37 | $0.00 | $28.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $31.74 | $17.76 | $49.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $30.54 | $17.76 | $48.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $57.51 | $28.35 | $85.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $58.38 | $25.29 | $83.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $45.48 | $22.42 | $67.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | $22.42 | $67.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | $22.42 | $67.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $38.45 | $22.29 | $60.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $50.43 | $26.96 | $77.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $40.53 | $15.99 | $56.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKS | $60.69 | $38.44 | $99.13 | $0.00 | $0.00 | $0.00 | $0.00 |