Wage Determination MO20260008-15874-bld
Cedar, MO · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MO20260008-15874-bld covers 27 trade classifications for building construction in Cedar, MO. Total packages (base + fringe) range from $20.44/hr to $99.13/hr, with the highest going to VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKS. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MO20260008-15874-bld
Revision: 1
Type: building
County: Cedar
State: MO
Effective: May 17, 2026
Trades covered: 27
Highest rate: $99.13/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 | $45.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $30.75 | $0.50 | $31.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $29.50 | $21.50 | $51.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 | $24.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $32.25 | $20.81 | $53.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $20.72 | $8.93 | $29.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $22.71 | $0.00 | $22.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $36.00 | $34.25 | $70.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $26.50 | $13.18 | $39.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $28.00 | $13.18 | $41.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $20.44 | $0.00 | $20.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | $7.47 | $31.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $24.47 | $0.00 | $24.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: WATER TRUCK | $28.37 | $0.00 | $28.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | $25.79 | $15.35 | $41.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $39.35 | $15.72 | $55.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $39.35 | $15.72 | $55.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $31.62 | $18.07 | $49.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $31.62 | $18.07 | $49.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $31.62 | $18.07 | $49.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $30.91 | $18.07 | $48.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $30.73 | $14.51 | $45.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $34.43 | $17.86 | $52.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $26.47 | $14.89 | $41.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKS | $60.69 | $38.44 | $99.13 | $0.00 | $0.00 | $0.00 | $0.00 |