Quick Answer
Wage determination MO20260007-15707-bld covers 22 trade classifications for building construction in Carroll, MO. Total packages (base + fringe) range from $19.38/hr to $85.86/hr, with the highest going to PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MO20260007-15707-bld
Revision: 2
Type: building
County: Carroll
State: MO
Effective: May 17, 2026
Trades covered: 22
Highest rate: $85.86/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 | $81.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $39.85 | $21.70 | $61.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $31.53 | $0.00 | $31.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.86 | $7.50 | $26.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $54.01 | $27.85 | $81.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER | $26.44 | $0.00 | $26.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $14.19 | $5.19 | $19.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $39.00 | $34.25 | $73.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $28.35 | $18.05 | $46.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $28.75 | $18.05 | $46.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | $0.00 | $31.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $24.43 | $17.76 | $42.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $57.51 | $28.35 | $85.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $58.38 | $25.29 | $83.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $45.48 | $22.42 | $67.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | $22.42 | $67.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | $22.42 | $67.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $38.45 | $22.29 | $60.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $50.43 | $26.96 | $77.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $40.53 | $15.99 | $56.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 | $0.00 | $0.00 | $0.00 | $0.00 |