Wage Determination MN20260021-15603-res

Stearns, MN · residential · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MN20260021-15603-res covers 19 trade classifications for residential construction in Stearns, MN. Total packages (base + fringe) range from $11.50/hr to $85.37/hr, with the highest going to PLUMBER. FOOTNOTE: PAID HOLIDAY: LABOR DAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MN20260021-15603-res
Revision: 1
Type: residential
County: Stearns
State: MN
Effective: May 17, 2026
Trades covered: 19
Highest rate: $85.37/hr
Official source: SAM.gov reference MN20260021View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $43.86 $17.70 $61.56 $0.00 $0.00 $0.00 $0.00
CARPENTER $36.71 $20.17 $56.88 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $52.00 $32.80 $84.80 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, ELECTRICAL CONTRACTS $5 MILLION AND OVER $50.45 $31.14 $81.59 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, ELECTRICAL CONTRACTS UNDER $5 MILLION $50.00 $30.86 $80.86 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $46.35 $36.86 $83.21 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.26 $2.81 $16.07 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $11.50 $0.00 $11.50 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 MASON TENDER PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR $21.81 $14.97 $36.78 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 PIPELAYER PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR $22.56 $14.97 $37.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE $34.85 $15.95 $50.80 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE $33.10 $15.95 $49.05 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 $32.93 $15.95 $48.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE $31.42 $15.95 $47.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 8 OILER $28.29 $15.95 $44.24 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY. PROJECTS UNDER $8,000: RECEIVE 80% OF BASIC HOURLY RATE $24.91 $13.31 $38.22 $0.00 $0.00 $0.00 $0.00
PLUMBER. FOOTNOTE: PAID HOLIDAY: LABOR DAY $53.16 $32.21 $85.37 $0.00 $0.00 $0.00 $0.00
ROOFER $42.93 $22.87 $65.80 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.60 $25.14 $60.74 $0.00 $0.00 $0.00 $0.00
View all WDs for Stearns → Revision history →